MEASUREMENT OF PRODUCTION PROCESS PRODUCTIVITY OF BOLT HEXAGON NUT M10 X 60MM WITH JUST IN TIME METHODS AND MANUFACTURING CYCLE EFFECTIVENESS (MCE) TO REDUCING NON VALUE ADDED ACTIVITY

 Abstract views: 200 ,  downloads: 187
  • Indah Apriliana Sari Universitas 45 Surabaya
  • Reynaldi Septi W Universitas 45 Surabaya
  • Darmadi Universitas 45 Surabaya
Keywords: Productivity, Just in Time, Manufacturing Cycle Effectiveness, Bolt Hexagon Nut

Abstract

The purpose of this research is to calculate the value of productivity carried out in the production of Bolt Hexagon Nut M10X 60MM that have applied the Just in Time method. Machine productivity calculations are carried out using Manufacturing Cycle Effectiveness (MCE) to reduce non-value-added processes. The results of research conducted from January to December 2017 showed an increase in the MCE value of 35%, and productivity increased by 139.75 kg / hour for one year. The calculation shows that MCE is very effective for use in planning and improving value-added activities.

Downloads

Download data is not yet available.

References

1. Ansori, A., Yusianto, R., Tjahyono, R.,, 2015, Penerapan Manufacturing Cycle Effectiveness (MCE) Sebagai Upaya Perbaikan Efektifitas Produksi pada CV. Niaga Manunggal, Psi Udinus, Udinus Repository eprints URL : http://eprints.dinus.ac.id/id/eprint/17527.
2. Hong, D., Yeh, Mo., ____ , Just in Time Manufacturing, University of Toronto, MGT2405. Accessed in https://www.academia.edu/36764453/8_JUST-IN-TIME_MANUFACTURING tanggal 03 Juli 2019.
3. Putri, N., Utary, A.R., Nadir, M., 2016, Analisis Manufacturing Cycle Effectiveness (MCE) Dalam Mengurangi Non Value Added Activities, Jurnal Manajemen Volume 8 (2). ISSN Print : 2085-6911, ISSN Online : 2528-1518.
4. Purnamasari, I., Adhimursandi, D., Nadir, M., 2018, Optimalisasi Manufacturing Cycle Effectiveness (MCE) Terhadap Pengelolaan Value Added Activities dan Non Value Added Activities Dalam Meningkatkan Efisiensi Produksi, Jurnal Manajemen 10 (1), hal 29-37.
5. Singgih, M. L., 2012, Green Productivity Konsep dan Aplikasi, ITS Press Surabaya, ISBN 978-602-9494-58-7.
6. Wardhana, R.S., 2018, Analisis Produktivitas Produk Baut Hexagon Nut Tipe M10X 60MM Dengan Metode Just in Time di PT. Abhijana Jaya Braja Sejahtera, Skripsi Mahasiswa Prodi Teknik Industri, Universitas 45 Surabaya.
Published
2019-07-31
How to Cite
Sari, I. A., Septi W, R., & Darmadi. (2019). MEASUREMENT OF PRODUCTION PROCESS PRODUCTIVITY OF BOLT HEXAGON NUT M10 X 60MM WITH JUST IN TIME METHODS AND MANUFACTURING CYCLE EFFECTIVENESS (MCE) TO REDUCING NON VALUE ADDED ACTIVITY. Tibuana, 2(02), 1-8. https://doi.org/10.36456/tibuana.2.02.1917.1-8
Section
Articles