MEASUREMENT OF WORKING TIME IN THE PRODUCTION PROCESS â€KERUPUK IKANâ€IN GRESIK HOME INDUSTRY
MEASUREMENT OF WORKING TIME IN THE PRODUCTION PROCESS â€KERUPUK IKANâ€IN GRESIK HOME INDUSTRY

DOI:
https://doi.org/10.36456/tibuana.1.1.1586.20-23
Keywords:
Normal time, Standard time, cycle time, Production process.Abstract
Measurement of time in the production process is necessary to know the length of time on each steps of making fish crackers. The timing is done directly using a stopwatch tool, with the aim of knowing the normal time, standard time, and cycle time as an improvement of production process time. In this study using descriptive method, which is one research method that describes the place of the process of production of fish crackers as appropriate. The result shows the time required in one production process is normal time 3986,12 minutes, standard time 4113,84 minutes, and cycle time get 2657,02 minutes.
Downloads
References
Darsini. (2014). “Penentuan Waktu Baku Produksi Kerupuk Rambak Ikan Laut “Sari Enak†Di Sukoharjoâ€,Spektrum Industri, No. 2 Vol. 12 No. Halaman 113 – 247.
Rinawati, D, I. Puspitasari, D. Muljadi, F. (2012). “Penentuan Waktu Standar Dan Jumlah Tenaga Kerja Optimal Pada Produksi Batik Cap (Studi Kasus: IKM Batik Saud Effendy, Laweyan)â€, Jurnal Teknik Industri Undip, No. 3 Vol VII.
Widiawati, U, T. (2009). “Deskripsi Time and Motion Study Untuk Mengetahui Waktu Baku Di Produksi Sambal PT. Heinz ABC Indonesia Karawangâ€. Laporan Khusus, Universitas Sebelas Maret, Surakarta.
Wignjosoebroto, S. (2006). “Ergonomi Studi Waktu dan Gerakâ€. Guna Widya, Surabaya.