RE-LAYOUT PRODUCTION FACILITY BREAD USING FTC AND ARC METHOD IN PT. XYZ
RE-LAYOUT PRODUCTION FACILITY BREAD USING FTC AND ARC METHOD IN PT. XYZ
DOI:
https://doi.org/10.36456/tibuana.1.1.1590.41-48Keywords:
Facility layout, From to chart, Activity relationship chart.Abstract
Layout arrangements are vital for improving quality, productivity and corporate image. A production requiring multiple machines and a production process flow that is too long necessitates the preparation of a detailed layout in order that there is no transfer flow movement in the production process. This study aims to make the production process has a total minimum displacement moment and increase employee performance. From the analysis conducted at PT. XYZ that produce bread shows the existence of long distance, motion behind and congestion during material handling. The result of analysis by using method from to chart shows that the distance of material transfer distance is 73, 70 meter, total frequency of material transfer 35 times and mileage with total 1,901 meter. The result of analysis using activity relationship chart where spray & seeding (J) and split machine (K) departments were moved close to proofing room 1 (H1) and proofing room 2 (H2) facility, rack & pan 1 (I1) facility was moved near With rack, tray & pan cleanning (G) area facilities and the sieving flour (B) and formula room (D) departments being moved close to the process area 2 (C2) facility.
References
Dewi Ni Made E.N., (2014), Kajian Interior Elemen Pembentuk dan Pelengkap Pembentuk Ruang, Jurnal Desain Interior Vol. 1, No. 1, page 1 – 17.
Dewi Sari D.R., Prianto A.Y., Mulyono J.,(2012), Perbaikan Tata Letak Pabrik Dengan Menggunakan Metode Clustering (Study Kasus: PT:SBS), Prosiding Seminar Nasional Aplikasi Sains & Teknologi Periode 3, ISSN : 1979 – 911X, page A-25 – A-35.
Laksito, B., (2014), Metode Perencanaan & Perancangan Arsitektur. Griya Kreasi Jakarta timur.
Nursandi.,Mustofa H.F., Rispianda., (2014), Rancangan Tata Letak Fasilitas dengan Menggunakan Metode Blocplan (Studi Kasus PT. Kramatraya Sejahtera),Reka Integra ISSN: 2338-5081, No.03, Vol.01, page 90 – 100.
Pratiwi I., Muslimah E., Aqil W.A., (2012), Perancangan Tata letakFasilitas di IndustriTahuMenggunakanBlocplan,JurnalIlmiahTeknikIndustri, ISSN: 1412-6869, Vol. 11, No. 2, page 102 – 112.
Prasetya Y.Y., Runtuk K.J., Hartanti S.P.L., (2015),Analisis Tata Letak Fasilitas dalam Meminimasi Material Handling (Study Kasus: Perusahaan Roti Matahari), Jurnal Gema Aktualita, Vol. 4 No. 1, page 1-10.
Sugiyono, (2011), Metode Penelitian Kuantitatif, Kualitatif dan R&D. Alfabeta Bandung.
Suhada K., Arisandhy V., Cahyadi A.D., (2011), Usulan Perbaikan Tata Letak Mesin Dengan Menggunakan Metode Fraktal (Study Kasus di PT “X†Cimahi),Jurnal Integra Vol. 1, No. 1, page 21 – 40.
Wignjosoebroto, S., (1992),Tata Letak Pabrik dan Pemindahan Bahan. PT. Guna Widya Jakarta.












