Analysis of time and cost using time cost trade off method in pressure vessel project. Tibuana : Journal of Applied Industrial Engineering, [S. l.], v. 6, n. 2, p. 109–118, 2023. DOI: 10.36456/tibuana.6.2.7757.109-118. Disponível em: https://jurnal.unipasby.ac.id/tibuana/article/view/7757. Acesso em: 4 aug. 2026.