“Design and Build of Dacron Pillow Filling Machine to Increase Production Capacity and Reduce Production Costs”. 2024. Tibuana : Journal of Applied Industrial Engineering 7 (2): 90-97. https://doi.org/10.36456/tibuana.7.2.8889.90-97.