“Maintenance Preventive Scheduling of Critical Components in Offset Printing Machine (Case Study : PT. XYZ)” (2021) Tibuana : Journal of Applied Industrial Engineering, 4(02), pp. 110–119. doi:10.36456/tibuana.4.02.4012.110-119.