“Design and Build of Dacron Pillow Filling Machine to Increase Production Capacity and Reduce Production Costs”. Tibuana : Journal of Applied Industrial Engineering, vol. 7, no. 2, July 2024, pp. 90-97, https://doi.org/10.36456/tibuana.7.2.8889.90-97.