[1]
2025. EVALUASI EFISIENSI BIAYA DAN WAKTU PADA PROYEK PEMBANGUNAN JEMBATAN MENGGUNAKAN VALUE ENGINEERING. WAKTU: Jurnal Teknik UNIPA. 23, 2 (Jul. 2025). DOI:https://doi.org/10.36456/ba854968.